55% of Clinical Trial Sites Report 5+ Months to Activate

As part of our "60 Second Stat Series", here's a quick read about important workforce planning statistics (and a checklist to keep you on track.)

V

Vertage

Clinical Checklist

55%¹ of sites report more than five months between site selection and full activation. That's a long wait, especially when delays can push back "first patient in."

Part of the problem is staffing. Start-up responsibilities often fall to people who already have a full workload. Something as seemingly simple as a late hire can put an entire study behind schedule.

So how far ahead should you be thinking about your clinical workforce? Probably further than you think.

What to do 9 to 12 months out

  • Start with the study itself. Build your workforce plan around each program's phase, number of sites and countries, and anticipated enrollment pace.
  • Figure out what your own people can realistically handle, what your CRO will take on and where you'll need outside specialists. Have a backup plan should your CRO's priorities shift.
  • Assign owners. Right now. Name someone responsible for each function: clinical operations, data management, biostatistics, regulatory, safety and quality.

Next, work backward from your deadlines.

  • Anticipate how staffing needs will change: more hands during start-up, consistent coverage throughout enrollment and fewer people toward close-out.
  • Decide which gaps might require an individual specialist and which would be better served by a dedicated team.

Six to nine months out, focus on your start-up team.

Who do you need to line up early?

  • Leadership: Clinical operations leads and project managers, before site selection begins.
  • Start-up: Dedicated people for contracts, budgets, ethics and regulatory submissions, and site activation.
  • TMF: A named owner with the resources to build and maintain an inspection-ready trial master file under ICH E6(R3).
  • Oversight: Someone actively managing your CRO and other vendors, plus a QA lead with adequate audit coverage.
  • Monitoring and data: Enough CRAs to cover anticipated sites and visits. Line up data managers and biostatisticians before database build.

Be prepared to change how you staff.

Early on, you may need individual specialists. As the study grows, you may need additional CRAs or a managed team. If you're already behind schedule, consider SOW project delivery for specific areas of work, such as start-up or TMF management.

When a start date slips, revisit your workforce plan. Review co-employment and worker classification considerations before moving to an SOW model. Ideally, choose a workforce partner who can accommodate these changes.